Skip to content
All industries
Civil & Infrastructure
Engineering edition · 10 modules on by default

Civil Engineering Project Management Software India

From chainage to certified RA bill — without the Excel chase. Roads, bridges, buildings — chainage progress, RA bills and authority letters.

ProjectSathi Site HQ Command Center for a civil contractor: active sites, chainage completed, RA bills pending, manpower, critical material alerts and budget by layer
Civil & Infrastructure demo: NH-48 Bypass · Package 3Real product screen from the live demo, sample data.

What the demo opens on

Site HQ Command Center.

The first screen is the sample project NH-48 Bypass · Package 3, with the figures a Civil & Infra team checks first thing in the morning. Every number links to the module behind it.

Active sites
0
Chainage completed
0.0 km
RA bills pending certification
0
Manpower on site
0
Budget utilisation
0.0%
Vehicles active
0 / 0
Stock alerts
0
EOT claims open
0
Progress is measured in
km of chainage
Work is broken into
layers
The bill is a
RA bill
The day closes with a
DPR
Letters go to
NHAI, PWD and private clients

In your vocabulary

Plan it, run it, bill it.

Three screens from the Civil & Infra demo, as they open the moment the setup wizard finishes.

  1. 1
    Plan

    The schedule, in layers.

    Progress is measured in km of chainage. The critical path, what is behind, and the milestone that matters, on one Gantt.

    Project Management
    ProjectSathi Gantt for NH-48 Bypass Package 3 with earthwork, GSB, WMM and DBM layers on a critical path
  2. 2
    Run

    Stock, requests and reorder alerts per store.

    What is on hand against the reorder point, what is on request, what is on its way. Long-lead items with their own register.

    Inventory & Supply
    ProjectSathi stock monitoring for a road project: cement, TMT steel, bitumen and diesel with reorder alerts
  3. 3
    Bill

    The RA bill, with GST line by line.

    Certified quantities become the RA bill. Gross, net payable, due date and status for every bill, and the GST filing periods behind them.

    BOQ & Billing
    ProjectSathi RA bills for a road project with GST, due dates and certification status

Types of work

Then narrow it to the work you do.

The type of work sets the dashboard title, the unit of progress and the names of the work packages.

  • Roads & highways

    Chainage-wise progress and billing by layer

  • Bridges & flyovers

    Span, pier and deck-element progress

  • Buildings

    Tower, floor and trade-wise BOQ

  • Real estate portfolio

    Portfolio roll-up for owners and lenders

Modules on by default

The 10 modules a Civil & Infra team starts with.

Already ticked in the setup wizard. Untick what you don't need, or open a plan group to add more; Dashboard always stays on.

Try five things

Fifteen minutes in the demo.

Everything is sample data, so click freely. These five show most of what the product does.

  1. 1

    Approve a progress bill

    Open Project Intelligence → All bills. Pick a bill that's waiting, check the submitted and recommended amounts, and approve it (or reject it with a reason). The register and the dashboard update straight away.

  2. 2

    Run payroll and download the NEFT file

    Open Financial Control → Salary processing, preview the month's payroll and process it. Then go to Bank transfers and download the NEFT bulk-payment file, and open Payslips to print one.

  3. 3

    Raise a material request

    Open Inventory & Supply → Material requests and raise one for a site. Approve it, then issue the stock against it and watch the stock level change in Stock monitoring.

  4. 4

    Export a report

    Almost every register has an Export menu. Open Dashboard → Reports (or any list) and export it to Excel (CSV) or PDF.

  5. 5

    Switch your role

    Use the role switcher in the header to view the workspace as the owner, a project manager or a site engineer. The project manager doesn't see payroll, AI documents or admin; the site engineer sees site work, stores and mail, and can't edit records.

  1. 1

    Say who you are

    Name, company, an email and a WhatsApp number. A 6-digit code confirms the email.

  2. 2

    Pick your industry and modules

    Civil, mechanical, chemical, energy or architecture; then the type of work; then the modules you want on, grouped by plan.

  3. 3

    Take the 90-second tour

    The workspace opens with sample projects in your vocabulary. The tour walks the screens that matter, then it's yours to click through.

Open the live demo·Read the step-by-step guide

civil engineering project management software

Civil & Infra projects, the way they actually run.

A civil package runs on three documents that never agree: the daily progress report from the site, the measurement behind the next progress bill (RA bill), and the letter from the authority that changes both. Civil engineering project management software keeps them on one record, so the chainage completed this week is the quantity billed next month and the evidence behind the extension-of-time claim after that.

Chainage progress that reaches the progress bill

Progress on a road or a bridge is measured in chainage, spans and layers, not in percentages. Site Management captures it that way: the daily progress report logs workforce deployed, materials received, work completed and blockers from the mobile app, offline, with geo-stamped photos and the day's weather against the site. Project Management sequences the packages on a Gantt chart with dependencies and a critical path, so a delayed culvert shows which embankment and pavement layers move with it. Because the daily log, the task and the BOQ (bill of quantities) item sit on one record, the quantity measured this week becomes the quantity in next month's progress bill without being retyped from a site diary into a measurement sheet and then into Excel.

BOQ, progress bills and GST without the Excel chase

BOQ & Billing imports the bill of quantities from Excel, versions it, and breaks each item rate into material, labour, machinery and overheads. Certified quantities become progress bills (RA bills) with GSTIN-aware, HSN-coded lines and the CGST, SGST or IGST split handled correctly, exportable to GSTR and to Tally. Submitted, recommended and approved amounts are tracked on every bill, and Project Intelligence lists all of them across every project with the gap between claimed and certified visible to the owner. Payment milestones and ageing per client sit alongside, so retention, mobilisation recovery and a slow-paying authority are visible against the contract rather than in a side sheet the billing engineer keeps on a laptop.

Fleet, materials and workforce on every site

The money on a civil site leaks through diesel, cement and the attendance register. Fleet & Mobility reconciles driver-logged fuel fills, with a photo of the bill, to each vehicle's mileage and route, and alerts before PUC, fitness, insurance or permits expire. Inventory & Supply shows live stock per site with consumption velocity, runs material requests from the field through approval to issue, and fires reorder alerts before the stock runs out. HR & People takes attendance on the mobile app with a geo-stamp and photo, offline, and flags missing PF, ESI, PT or TDS details before the payroll run; Financial Control then runs the payroll with statutory deductions and the NEFT bank file, and tracks the imprest cash issued to field engineers against their expense claims.

Authority letters, EOT claims and the audit trail

Every letter from NHAI, a state PWD, a PMC or a private client is logged in Document & Mail with reference, party, priority and status, summarised by an AI pass and tracked to a reply; outward letters are versioned. Project Intelligence shows all letters with a reply-due date and days open, every extension-of-time request with its justification and approval trail, and every change order with its financial impact. Because the weather log, the daily progress report and the letter are dated and sit together, an EOT claim is assembled from contemporaneous records rather than reconstructed months later. Tender Management closes the loop at the front: GeM, CPWD, NHAI and state PWD feeds, keyword alerts, a bid tracker and deadline reminders, handing the won package straight to execution.

Questions

Civil & Infra teams ask.

Guides for Civil & Infra teams

All guides

See ProjectSathi on your Civil & Infra projects.

We set it up with one of your live projects, your layers and your BOQ before the call.