Cost leakage calculator

Every site leaks. Find out how much.

Five sliders, thirty seconds. See what material pilferage, ghost attendance, slow RA billing, and untracked vehicles cost your business every year — and how much is recoverable.

Step 1 · Your business

Set your numbers

125
10500
102,000
0100
790
Every rate below is a default you can change — we have not measured your sites, and these are starting assumptions rather than findings. Adjust them to your own numbers for a figure you can actually stand behind.
Step 2 · Your estimate
₹78.6 L
estimated recoverable leakage per year · ≈ ₹6.6 L every month
Industry-typical estimate
Material leakage
₹36 L
46% of total
Idle & ghost workforce
₹21.6 L
27% of total
Delayed / missed progress billing
₹9 L
11% of total
Vehicle fuel & maintenance
₹12 L
15% of total
Across ≈ 240 workers on 4 sites, ghost and idle attendance alone is worth about ₹9,000 per worker per year.
Separately · working capital

Billing in 7 days instead of 30 releases about ₹1.13 Cr of cash 23 days earlier — worth roughly ₹13.6 L a year at a 12% cost of finance.

Not counted in the figure above — this is cash recovered faster, not leakage stopped.

Get the detailed breakdown

How this is calculated

Material leakage: 2% of annual billing — recoverable via digital stock & consumption tracking.
Idle & ghost workforce: 4% of workforce cost (workforce ≈ 30% of billing) — recoverable via geo-tagged attendance.
Delayed / missed progress billing: 0.5% of annual billing — recovered through faster, fully-certified progress bills.
Vehicle fuel & maintenance: ₹1.2 L per vehicle per year — recoverable via trip, fuel & maintenance logs.

About these rates. The defaults above are our own planning assumptions for Indian civil contracting — not the output of a study, and not measured at your sites. We publish them openly and let you change every one, because the only version of this number worth acting on is the one built from rates you recognise. Actual recoverable amounts vary with contract type, site controls and execution discipline; treat the result as directional, not as a guarantee of savings.

Adjust the assumptions

These are defaults, not measurements. Set them to your own rates.

Free · no obligation

Get the detailed breakdown for your business

We’ll take your numbers — currently ₹78.6 L a year in estimated recoverable leakage — and turn them into a site-by-site recovery plan.

Estimates are based on industry-typical leakage ranges; actual figures vary by business. No spam — one detailed report, one follow-up.

Plug the leak before the next progress bill.

Stock tracking, geo-tagged attendance, certified billing, and fleet logs — live on your projects in weeks, not quarters.