Cost leakage calculator
Every site leaks. Find out how much.
Five sliders, thirty seconds. See what material pilferage, ghost attendance, slow RA billing, and untracked vehicles cost your business every year — and how much is recoverable.
Set your numbers
Billing in 7 days instead of 30 releases about ₹1.13 Cr of cash 23 days earlier — worth roughly ₹13.6 L a year at a 12% cost of finance.
Not counted in the figure above — this is cash recovered faster, not leakage stopped.
How this is calculated
About these rates. The defaults above are our own planning assumptions for Indian civil contracting — not the output of a study, and not measured at your sites. We publish them openly and let you change every one, because the only version of this number worth acting on is the one built from rates you recognise. Actual recoverable amounts vary with contract type, site controls and execution discipline; treat the result as directional, not as a guarantee of savings.
Adjust the assumptions
These are defaults, not measurements. Set them to your own rates.
Free · no obligation
Get the detailed breakdown for your business
We’ll take your numbers — currently ₹78.6 L a year in estimated recoverable leakage — and turn them into a site-by-site recovery plan.
Plug the leak before the next progress bill.
Stock tracking, geo-tagged attendance, certified billing, and fleet logs — live on your projects in weeks, not quarters.